We earn commissions from qualifying purchases through links on this page (Amazon Associates, eBay Partner Network, and select brand programs). It doesn't change what we recommend. Prices move constantly, so we use $ / $$ / $$$ tiers instead of quoting numbers.
The short version
- Nine states have signed plug-in solar laws as of mid-September 2026: Utah, Maine, Virginia, Maryland, Colorado, Connecticut, Vermont, New Hampshire and New Jersey.
- California is the one to watch. SB 868 passed both chambers and sits with Governor Newsom, who has until September 30, 2026 to act. If it becomes law, it takes effect January 1, 2027.
- 1,200 watts is the common cap. Colorado is the outlier at up to 1,920 watts, with an electrician required above 391 watts.
- Certification is the real bottleneck. Most laws require UL or equivalent listing, and very little hardware holds the new UL 3700 plug-in certification yet.
- No state gives you export credit for plug-in systems by default. You save on power you use while the sun is shining.
Plug-in solar (also called balcony solar, plug-and-play solar or PIPV) went from a European curiosity to one of the fastest-moving pieces of US energy legislation in about eighteen months. Utah went first in March 2025. By September 2026, eight more states had followed, a ninth signature was sitting on the desk of the governor of the largest solar market in the country, and more than thirty legislatures had seen bills introduced.
That speed is great for buyers and terrible for accuracy. Trackers disagree on effective dates, some sites still count seven states while others count nine, and product listings routinely claim a legality their hardware doesn't actually meet. This guide is our attempt at a clean, state-by-state reference for people who want to buy and install a small plug-in system this year, written from a builder's point of view: what the law says, what it requires of the hardware, and what it means for the outlet you're planning to plug into.
One ground rule before we start: we are not lawyers, and this is not legal advice. Laws change, effective dates slip, and utilities interpret rules differently. Every state section below ends with the same instruction: confirm with your utility before you connect anything.
What the law means by "plug-in solar"
Nearly every state bill is built on the same template, which is worth understanding because it tells you what kind of product the law actually protects. A qualifying device is typically:
- Small. Most laws cap output at 1,200 watts AC per home or per meter. That is roughly two to four standard residential panels feeding one or two microinverters.
- Connected through an ordinary outlet. The device plugs into a receptacle on a branch circuit instead of being hardwired into your panel.
- Grid-interactive but safe when the grid is down. The inverter must stop producing (anti-islanding) when utility power disappears, so a lineworker repairing a downed line isn't hit by power flowing backward from your balcony.
- Certified. Laws require listing by UL or another nationally recognized testing laboratory (NRTL). Newer laws reference UL 3700 by name.
- Exempt from the interconnection process. This is the whole point. Instead of filing an interconnection application, paying fees and waiting weeks, you plug in. Some states still let the utility require a simple notification.
What the laws generally do not do matters just as much. They don't create net metering for plug-in devices, so any power you push past your own consumption isn't credited. They don't make the device a backup power source; when the grid goes down, a grid-tied microinverter shuts off. And they don't override the electrical code, so a flimsy extension cord or a circuit that's already loaded to the limit is still a bad idea whether or not your state has a plug-in law.
The state-by-state status table
Here's where things stand as of September 17, 2026. Where credible trackers disagree, we say so rather than picking one.
| State | Bill | Signed | Effective | Output cap | Worth knowing |
|---|---|---|---|---|---|
| Utah | HB 340 | March 2025 | In effect | 1,200 W | The first. No interconnection agreement or utility fees; UL or equivalent listing |
| Maine | LD 1730 | April 6, 2026 | Check with utility | 420 W simple tier; up to 1,200 W with added requirements | First enacted law to name UL 3700 |
| Virginia | HB 395 / SB 250 | April 2026 | July 1, 2026 | 1,200 W | Returned once by the governor for wording changes before signing |
| Maryland | HB 1532 | May 12, 2026 | Trackers list July 1 or Oct 1, 2026 | 1,200 W | Utility notification; possible disconnect-switch requirement; small devices under 391 W exempt from certification |
| Colorado | HB26-1007 | May 7, 2026 | Aug 12, 2026 (some provisions Jan 1, 2027) | Up to 1,920 W | Electrician required above 391 W; meter collar adapters; HOA protections |
| Connecticut | Public Act 26-127 | June 4, 2026 | Oct 1, 2026 | 1,200 W | Watch for utility implementation guidance this fall |
| Vermont | S.202 | June 16, 2026 | July 1, 2026 | 1,200 W | Passed both chambers unanimously |
| New Hampshire | SB 540 | Early July 2026 | Trackers differ; most provisions reported for Jan 1, 2027 | 1,200 W | Separate legal category from traditional grid-tied solar |
| New Jersey | Garden State Balcony Solar Act | Sept 1, 2026 | March 1, 2027 | 1,200 W | Renter protections against landlord and HOA bans |
| California | SB 868 | Pending (deadline Sept 30) | Jan 1, 2027 if enacted | 1,200 W AC | Exemption sunsets Jan 1, 2030 in current text |
| New York | SUNNY Act (S8512 / A9111) | Passed both chambers, awaiting governor | TBD | TBD | Governor has until year end |
Enacted states in detail
Utah: the template everyone copied
Utah's HB 340 passed unanimously in March 2025 and created a category for portable solar generation devices up to 1,200 watts. It exempts them from interconnection agreements, bars utilities from requiring approval or charging fees, and requires UL or equivalent certification. Because it was signed before UL 3700 existed, it doesn't name the new standard; in practice, buyers have leaned on UL 1741-listed microinverters. Utah is also where EcoFlow chose to launch its STREAM plug-and-play line in the US, which tells you how much manufacturers value a clean legal pathway.
Maine: the first law to name UL 3700
Maine's LD 1730 was signed April 6, 2026, and it introduced something other states are now studying: tiers. A simplified plug-and-play tier covers systems up to 420 watts, with additional requirements for systems up to 1,200 watts. It was also the first enacted law to reference UL 3700 by name while still allowing comparable standards from other labs. If you're in Maine and want to start small, one or two panels under the simple tier is the lowest-friction route.
Virginia: effective July 1, 2026
Virginia's matching bills (HB 395 and SB 250) passed both chambers, were returned by the governor for language tweaks, and were signed in April. The law took effect July 1, 2026 with a 1,200-watt ceiling. Virginia is a big market with a lot of apartment stock, which makes it one of the more meaningful early states for renters.
Maryland: notification and a disconnect switch
Maryland's HB 1532 was signed May 12, 2026 as a centerpiece of Governor Moore's legislative agenda. The version that passed caps output at 1,200 watts per meter, requires certification by UL or an equivalent lab (devices of 391 watts or less are exempt from that certification requirement), waives utility fees and interconnection requirements, and requires you to notify the utility and provide system details. It also lets the utility require that you pay for an automatic locking disconnect switch. Trackers disagree on whether it took effect July 1 or takes effect October 1, 2026, so ask your utility before you connect.
Colorado: the highest cap, with the most structure
Colorado's HB26-1007, signed May 7, 2026, is the most expansive law so far and the most layered:
- Up to 1,920 watts for a portable-scale solar generation device, one system per residence.
- 391 watts and under is exempt from certification, though utilities are still recommending listed equipment.
- Above 391 watts, systems must meet UL 3700, and a licensed electrician must perform any modifications to building wiring for systems between 391 and 1,920 watts.
- HOAs can't ban qualifying systems, and renters can install after notifying their landlord.
- Meter collar adapters: the Public Utilities Commission must revise interconnection rules by December 31, 2026 to explicitly allow customer-owned meter collar adapters. We break these down in our meter socket adapter explainer.
The session-law effective date was August 12, 2026, with some provisions phasing in January 1, 2027. At least one Colorado co-op has told members that, as of summer 2026, no consumer product met the UL 3700 requirement for the upper tier, so the practical path today is a sub-391-watt system or waiting for certified hardware.
Connecticut: effective October 1
Connecticut's plug-in law was signed June 4, 2026 as Public Act 26-127 and takes effect October 1, 2026. Expect Eversource and United Illuminating to publish customer guidance around that date.
Vermont: unanimous and in effect
Vermont's S.202 was signed June 16, 2026 and took effect July 1. Both chambers passed it unanimously, which says something about how non-partisan small solar has become.
New Hampshire: its own legal category
New Hampshire's SB 540 was signed in early July 2026 and establishes plug-in solar as a legal category separate from traditional grid-tied systems. Effective-date reporting is inconsistent (some trackers list late July 2026, others say most provisions start January 1, 2027), so this is a state where a quick call to your utility saves real confusion.
New Jersey: renter protections, effective March 2027
The Garden State Balcony Solar Act cleared both chambers on June 30 without a single no vote and was signed by Governor Mikie Sherrill on September 1, 2026. The rules take effect six months later, on March 1, 2027. The standout feature for the state's large renter population is protection against landlord and HOA bans.
Pending: California, New York and the next wave
California SB 868
California's Plug and Play Solar Act passed the Assembly 73-0 on August 25, 2026, the Senate concurred on August 26, and the bill was presented to Governor Newsom on August 31. The constitutional deadline for him to sign or veto is September 30, 2026; if he does neither, it becomes law without his signature. Either way it wouldn't take effect until January 1, 2027.
As passed, SB 868 would:
- Allow up to 1,200 watts AC per dwelling, plugged into a standard outlet.
- Require UL or equivalent NRTL certification, including anti-backfeed protection that shuts the system off within seconds of a grid outage.
- Bar utilities from requiring approval or charging fees, while allowing them to require a simple online notification.
- Create no export compensation, so savings come only from self-consumption.
- Sunset the interconnection exemption on January 1, 2030 under the amended text, which means the Legislature will have to revisit it.
We'll update this section after September 30. Until the law takes effect, California customers are still under each utility's existing interconnection policy; ask yours how it classifies small plug-in systems and get the answer in writing.
New York, Massachusetts, Washington and others
- New York: The SUNNY Act passed both chambers and awaits Governor Hochul, who has until the end of the year.
- Massachusetts: A House bill (H5175) passed 128-27; the Senate hadn't finished action as of this writing.
- Washington: HB 2296 moved, but utilities pushed amendments that stripped meter collar provisions. Advocates say they will return in 2027.
- Oklahoma: HB 4060 passed the House 88-4 and then stalled in the Senate.
- Illinois, Iowa, Michigan, Minnesota and others have seen bills introduced without final action.
What if your state has no plug-in law?
No law doesn't mean "illegal" and it doesn't mean "allowed." In most states without a plug-in statute, any device that pushes power into your home wiring falls under the utility's standard interconnection rules, which were written for rooftop arrays. Some utilities will process a small system quickly; others will require the same paperwork as a 10 kW array.
Your realistic options in a non-law state:
- Ask the utility. Call and ask specifically how they treat a UL 1741-listed microinverter under 1,200 watts that plugs into an outlet. Get the answer in writing.
- Go off-grid instead. A solar generator (power station plus portable panels) never touches your home wiring, so it doesn't need interconnection anywhere. You plug appliances into the power station, not the other way around. It's more expensive per watt of solar, but it's legal in all fifty states and it gives you backup power, which grid-tied plug-in doesn't.
- Wait. Given the pace of 2026, a lot of states will have a law in 2027.
A portable power station with panels runs your devices from its own outlets and doesn't touch your home wiring. A plug-in solar kit backfeeds your wiring through a wall outlet. They're regulated completely differently, and a power station is legal everywhere.
Renters, landlords and HOAs
Renters are the biggest winners of this whole movement, but the protections vary a lot:
- Colorado prohibits HOAs from banning qualifying systems and lets renters install after notifying the landlord.
- New Jersey protects renters against landlord and HOA bans once the law takes effect in March 2027.
- Other states generally require tenants to notify landlords, and landlords can typically set reasonable rules around fire safety, electrical overload and how panels are mounted.
Even in a protected state, your lease still governs drilling, railing attachments and anything that could fall. For practical mounting and lease tips, see our renter's guide to balcony solar rules.
Certification: the part nobody wants to talk about
State laws say "UL listed" or "certified by an NRTL," and most shoppers assume there's a tidy list of approved kits. There isn't, yet.
- UL 1741 (with the SB supplement) is the established listing for grid-interactive inverters, including microinverters. It proves anti-islanding and grid-support behavior, but it was written for hardwired systems.
- UL 3700, the Outline of Investigation for plug-in PV equipment and systems, was published at the end of 2025, and the certification program launched in January 2026. It adds plug-in-specific requirements, most notably that the exposed plug prongs go dead within about a second of being unplugged.
- As of mid-2026, certified hardware is scarce. APsystems says its EZ1-LV microinverter is certified to UL 3700 and several kit makers are pursuing certification, but many products marketed as "plug-in legal" rely on component-level UL 1741 listings.
Our full breakdown is in UL 3700 explained. The buyer's rule of thumb: in a state that names UL 3700 for your size tier, don't buy until the listing is verifiable on the certifier's own database, not just on a product page.
The electrical reality: outlets, circuits and 1,200 watts
A 1,200-watt cap isn't arbitrary. A common 15-amp, 120-volt branch circuit is rated for 1,800 watts, and continuous loads are generally held to 80 percent of that (1,440 watts). A plug-in system feeds power into the circuit from the "wrong" end, which means the breaker can't see current that flows from your solar straight to a load on the same circuit. Keep your solar output modest and you keep that risk small.
Practical rules that apply in every state:
- Plug directly into a wall outlet. No extension cords or power strips.
- Use a circuit that isn't already heavily loaded. A dedicated outdoor or balcony circuit is ideal. Avoid the kitchen countertop circuit where a kettle and toaster already push the limit.
- Use a GFCI-protected outdoor receptacle with a weatherproof in-use cover if the outlet is outside.
- One system per home unless your state says otherwise; stacking two 1,200-watt kits defeats the whole safety logic.
- Call an electrician if your home has old wiring, aluminum branch circuits or a panel you already know is marginal.
Money: what changed in 2026
The federal Residential Clean Energy Credit (§25D) expired December 31, 2025, so there is no federal tax credit for a homeowner-purchased plug-in system installed in 2026. The savings case now rests on your electric rate, your sun hours and how much of the output you actually use during the day. Our plug-in solar payback guide walks through the math with stated assumptions instead of rosy estimates, and our plug-in vs rooftop comparison covers when a full array still wins.
Gear worth having before you plug in
Whatever state you're in, a few inexpensive pieces make a plug-in install safer and let you prove what it's doing.
UL 1741-listed microinverter (plug-in rated)
$$Best for: Builders assembling their own panel pair
The microinverter is the device every state law cares about. Look for a UL 1741 listing at minimum and UL 3700 where your state or tier names it. Two-input units that handle a pair of residential panels are the sweet spot for a 600 to 1,200 watt system.
Strengths
- The component regulators actually check
- Two-panel inputs keep wiring simple
- App monitoring on most current models
Trade-offs
- UL 3700 certified units are still scarce
- Verify the listing in the certifier's database, not just the listing photo
Balcony railing solar mounting brackets
$Best for: Renters and apartment balconies
Mounting is where landlords push back, so non-penetrating railing hooks and adjustable-tilt brackets are worth getting right. Check the rated wind load and your railing's material and thickness before buying.
Strengths
- No drilling in most designs
- Adjustable tilt improves output
- Easy to remove at move-out
Trade-offs
- Wind rating varies widely
- Heavy panels need sturdy railings
Plug-in energy monitor
$Best for: Anyone who wants to verify savings
An outlet-level or panel-level monitor shows how much your system produces and how much of it your home actually uses. That's the number that determines payback. See our full roundup of home energy monitors and smart plugs.
Strengths
- Turns guesses into data
- Helps you shift loads into sunny hours
Trade-offs
- Panel-mounted monitors need an electrician in some homes
For storage and off-grid systems we also track Bluetti power stations and Renogy panels, charge controllers and batteries direct from the brands.
Pre-purchase checklist
Before you buy anything, run through this list:
- Confirm your state's status and effective date using the table above, then the state's own bill text.
- Ask your utility how it treats plug-in systems and whether it wants notification. Save the email.
- Match your system to the tier. In Maine or Colorado, the small tier may be the only frictionless option right now.
- Verify the certification on the testing lab's public database.
- Read your lease or HOA rules, and send the notice your state requires.
- Pick the circuit and plug directly into a GFCI-protected outlet.
- Plan for self-consumption: run the dishwasher, laundry or a dehumidifier during peak sun.
Want to compare certified kits? Start with our UL 3700 plug-in solar kit guide, and if you're weighing storage, our plug-in solar battery guide explains what's actually sold in the US.
Frequently asked questions
How many states allow plug-in solar in 2026?
Nine states have signed plug-in solar laws as of September 2026: Utah, Maine, Virginia, Maryland, Colorado, Connecticut, Vermont, New Hampshire and New Jersey. Some of those take effect later (Connecticut on October 1, 2026 and New Jersey on March 1, 2027), and California's SB 868 is awaiting the governor's decision.
Is balcony solar legal in California right now?
Not under a dedicated state law yet. SB 868 passed the Legislature in August 2026 and the governor must act by September 30, 2026. If enacted, it takes effect January 1, 2027. Until then, your utility's existing interconnection rules apply.
What is the maximum wattage for plug-in solar?
Most state laws cap plug-in systems at 1,200 watts AC per home or meter. Colorado allows up to 1,920 watts but requires an electrician for wiring modifications above 391 watts. Maine has a simplified tier at 420 watts.
Do I get paid for extra power from a plug-in solar system?
Generally no. State plug-in laws don't create net metering for these devices, so power you don't use at the moment it's produced isn't credited. Size the system to your daytime baseline load.
Can my landlord or HOA stop me from installing plug-in solar?
It depends on the state. Colorado bars HOAs from banning qualifying systems, and New Jersey adds renter protections starting March 2027. Elsewhere, you typically must notify the landlord, who can set reasonable safety and mounting rules.
Is there a federal tax credit for plug-in solar in 2026?
No. The federal residential clean energy credit (§25D) expired on December 31, 2025, so systems installed in 2026 don't qualify. Check for state or utility rebates instead.
Does plug-in solar work during a power outage?
No. Grid-tied microinverters are required to shut off when the grid goes down. For outage power, you need a battery system or a portable power station.